The 38th and Waco Drive Bore and Replacement Project involved the relocation and replacement of potable water infrastructure at a high-traffic urban intersection in the City of Waco. The scope included the installation of 8-inch PVC C-900 restrained-joint water mains, the execution of a trenchless bore with 16-inch steel casing, and the installation of new valves, fittings, and reducers connected to the existing system.
Additional work included traffic control planning and implementation, trench safety systems, water meter relocation, and full surface restoration, including pavement, curbs, sidewalks, and affected storm structures, delivering a fully functional system with minimal disruption to traffic.
Eng:
Eng Project Manager:
Parties Involved:
Total Contract Amount:
$79,427.50
Client:
City of Waco
Location:
38th Street & Waco Drive, Waco, Texas
Completion Date:
August 17, 2017
Client:
City of Waco
Location:
38th Street & Waco Drive, Waco, Texas
Completion Date:
August 17, 2017