The Baylor Drive Lift Station Replacement Project involved the construction and commissioning of a new sanitary lift station, replacing existing infrastructure to improve system reliability and capacity. The scope included the lift station, odor control unit, backup generator, electrical controls and communications, and site fencing with controlled access.
Additional work included gravity sewer and force main installation, FRP manholes, bypass pumping, temporary dewatering, service reconnections, demolition of the existing lift station, and full site restoration, including concrete and asphalt pavement, delivering a modern and fully operational wastewater facility.

Eng:

Enprotec / Hibbs & Todd, Inc.

Eng Project Manager:

Parties Involved:

Total Contract Amount:

$1,039,710.52

Client:

City of Abilene

Location:

Abeline, Texas

Completion Date:

November 1, 2021

Client:

City of Abilene

Location:

Abeline, Texas

Completion Date:

November 1, 2021

Eng:

Enprotec / Hibbs & Todd, Inc.

Parties Involved:

Total Contract Amount:

$1,039,710.52

bottom of page