Carriage Hills Water Service Line Replacement – Phase I
Description:
The Carriage Hills Water Service Line Replacement – Phase I Project involved the complete replacement of existing potable water service lines to improve system reliability and performance within the Carriage Hills community. The scope included replacing ¾”, 1”, and 1½” service lines using HDPE (DR 9) piping, performed through both pipe bursting methods and open-cut excavation, from the corporation stop to the angle stop at each property.
Additional work included new connections, valves, fittings, flowable fill backfill, curb and sidewalk repairs, yard restoration, and asphalt pavement repairs where required, delivering a fully upgraded residential water service system.
Eng:
Davis Engineering, Inc.
Eng Project Manager:
Parties Involved:
Total Contract Amount:
$270,000.00
Client:
City of Cedar Park
Location:
Cedar Park, Texas
Completion Date:
August 17, 2017
Client:
City of Cedar Park
Location:
Cedar Park, Texas
Completion Date:
August 17, 2017
Eng:
Davis Engineering, Inc.
Parties Involved:
Total Contract Amount:
$270,000.00