Description:

The CR 170 Storm Drainage Improvements Project involved the construction and rehabilitation of stormwater infrastructure to improve runoff management and roadway safety. The scope included large-scale excavation, removal of existing infrastructure, installation of 18-inch and 24-inch reinforced concrete pipe (RCP), and the construction and adjustment of storm manholes, inlets, and grates.
Additional work included structure relocations, alignment adjustments, and restoration of disturbed surfaces, delivering a more efficient and reliable drainage system along the corridor.

Eng:

Eng Project Manager:

Parties Involved:

Total Contract Amount:

$477,520.88