Highland Drive Waterline Replacement

Description:

The Highland Drive Waterline Replacement Project involved the rehabilitation and upgrade of potable water infrastructure along Highland Drive in the City of Taylor. The scope included the installation of a new 8-inch PVC water main, gate valves, fire hydrant assemblies, water service laterals, and connections to the existing system.
Additional work included erosion and sediment control, traffic control planning, trench safety measures, hydrostatic testing, and full surface restoration, including asphalt pavement and sidewalk repairs, delivering a reliable and fully operational water distribution system.

Eng:

HDR Engineering, Inc.

Eng Project Manager:

Sherif Mabourk, P.E.

Parties Involved:

Total Contract Amount:

$608,920.37

Client:

City of Taylor

Location:

Taylor, Texas

Completion Date:

May 14, 2024

Client:

City of Taylor

Location:

Taylor, Texas

Completion Date:

May 14, 2024

Eng:

HDR Engineering, Inc.

Parties Involved:

Total Contract Amount:

$608,920.37