Jarrell 2015 CDBG WWL Phase 3

Description:

The Jarrell 2015 CDBG Wastewater Line Phase 3 Project involved the construction and improvement of sanitary sewer infrastructure to strengthen the City of Jarrell’s wastewater system. The scope included the installation of over 2,200 linear feet of 6-inch PVC SDR-26 sanitary sewer pipe, the construction of 4-foot diameter manholes, and direct connections to existing infrastructure.
Additional work included right-of-way preparation, site clearing, utility verification and protection, traffic control, erosion and sediment control (SWPPP), and full restoration of disturbed areas, including asphalt, concrete, rip-rap, and brick paver replacement, resulting in a fully functional and reliable wastewater system.

Eng:

BSP Engineers

Eng Project Manager:

Parties Involved:

Total Contract Amount:

$200,832.61

Client:

City of Jarrell

Location:

Jarrell, Texas

Completion Date:

May 31, 2017

Client:

City of Jarrell

Location:

Jarrell, Texas

Completion Date:

May 31, 2017

Eng:

BSP Engineers

Parties Involved:

Total Contract Amount:

$200,832.61